The road is now opened for
motorists coming from Ikorodu to Ketu and all other points on the axis.
The Lagos State Public
Works Corporation (PWC) has concluded the scheduled palliative road work on
Ikorodu Road, Mile 12 inward Ketu.
The repairs on bad sections
of the road which was earlier announced to end by 5.30am Wednesday 24th,
August, was concluded around 12.30pm Tuesday afternoon.
The General Manager, PWC,
Engr Olufemi Daramola stated that the corporation decided to double the number
of the required personnel and equipment for the repairs to ensure early
completion. He further expressed his appreciation to motorists for their
understanding while the rehabilitation was ongoing.
Apart from the repairs on
the main carriage way, the service lane from Mile 12 inward Ketu was also
graded for smooth vehicular movement. The sections of the service lane from
Ikosi Junction to Ketu was repaired and sealed with asphalt.
According to the General
Manager It is envisaged that the repairs so far carried out will further reduce
travel time and alleviate discomfort faced by motorists from Ikorodu axis.
No comments:
Post a Comment